
The Seikan Tunnel is a 53.85-kilometre (33.5-mile) dual-gauge railway tunnel in Japan, with a 23.3-kilometre (14.5-mile) segment running beneath the s
Scores and rankings reflect aggregated community opinion and are not editorial assessments by Peakd. Entity information (descriptions, images, links, pricing) may be sourced from automated tools or community contributions and is not guaranteed to be accurate or up-to-date. Peakd does not endorse, verify, or guarantee the accuracy of any content. Represent this entity? Claim this page to manage it. · Terms · Removal requests
The Seikan Tunnel is a 53.85-kilometre (33.5-mile) dual-gauge railway tunnel in Japan, with a 23.3-kilometre (14.5-mile) segment running beneath the seabed of the Tsugaru Strait, which separates Aomori Prefecture on Honshu, Japan's main island, from the northern island of Hokkaido. The tunnel's track level lies approximately 100 metres (330 ft) below the seabed and 240 metres (790 ft) below sea level. Following several decades of planning and construction, the tunnel opened on 13 March 1988.
Your slider rating is attached automatically. Write about your experience to help others decide.
No reviews yet. Be the first to share your experience.
No pros or cons yet. Suggest an edit to add some.